A data centre on the former Carmon Creek oil sands site, majority-owned by Woodland Cree First Nation, with a 650 MW gas power facility to supply it. AESO lists it as Mihta Askiy Data Load: 300 MW of data load alongside cogeneration, under review. The federal Impact Assessment Agency decided on 4 March 2026 that no federal assessment is needed.
Where it standsIt is on AESO’s connection list, but AESO has given it no in-service date. Its power plan combines the grid with dedicated generation.
- 2025-04-17 Filed with the operator 300 MW filed
- 2025-12-11 Announced
- No date In service the operator has set no date
- Power path
- Hybrid
- Setup
- Gas turbines, simple cycle first, later combined cycle
- Utility
- AESO
- Connection request
- AESO P3110 Mihta Askiy Data Load (300 MW)
- Target online
- Not stated
- Announced
- 2025-12-11
Filed with the system operator
From AESO's connection list.
| Reference | Stage | Filed | In service | Status |
|---|---|---|---|---|
| P3110 | EN1 | 300 MW | No date | No date yet |
One entry, 300 MW as filed.
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
Updated 2026-11-10.