Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Announced
1.2 GW
announcedpower for the data halls
0 MW
energized
None of it is built and energized yet.
A 1,494 MW gas plant, of which about 1,200 MW would power on-site data halls on a 900-acre site east of Calgary in Rocky View County. The AUC held its hearing on the plant in August 2026 and has not ruled. The federal Impact Assessment Agency decided in March 2026 that no further review is needed.
Where it standsIt plans to make its own power on site, so its timing rests on building and permitting that plant rather than on a grid connection.
- Power path
- Behind the fence
- Setup
- 1,494 MW gas plant of about 100 reciprocating engines
- Utility
- Not stated
- Connection request
- AUC Proceeding 30524 (power plant)
- Target online
- Not stated
- Announced
- 2025-06-17
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
- Beacon AI Centers, Indus Project Thermal Power Plant
- Beacon AI Centers Indus Project
- Beacon AI Hub Area Structure Plan
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
- Beacon AI Data Centre Hub, Chestermere Beacon AI Centers · 400 MW · Announced
Updated 2026-11-10.