Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Filed for connection
800 MW
announcedpower for the data halls
0 MW
energized
None of it is built and energized yet.
A 920 MW gas plant about 7 km east of Gibbons in Sturgeon County, of which about 800 MW would power on-site data halls. The AUC approved the plant, with conditions, on 23 October 2026. AESO also lists two Beacon Heartland grid load requests of 400 MW each.
Where it standsIt is on AESO’s connection list, but AESO has given it no in-service date. Its power plan combines the grid with dedicated generation.
- Power path
- Hybrid
- Setup
- 920 MW gas plant of about 200 reciprocating engines
- Utility
- AESO
- Connection request
- AESO P2934 Beacon Heartland A.I. Hub Load (400 MW), P3175 Beacon Heartland Data Load (400 MW)
- Target online
- Not stated
- Announced
- Not stated
Filed with the system operator
From AESO's connection list.
| Reference | Stage | Filed | In service | Status |
|---|---|---|---|---|
| P2934 | EN1 | 400 MW | No date | No date yet |
| P3175 | EN1 | 400 MW | No date | No date yet |
2 entries, 800 MW as filed.
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
- Beacon AI Centers, Heartland Project Thermal Power Plant application
- Beacon AI Centers Heartland Project
- AESO Connection Project List, October 2026
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Data Centre Hub, Chestermere Beacon AI Centers · 400 MW · Announced
Updated 2026-11-10.