Announced
400 MW
announced
0 MW
energized
None of it is built and energized yet.
Beacon plans a $4B, 400 MW campus on 310 acres in south Chestermere. Alberta's major projects list shows it as proposed, with approvals still being sought.
Where it standsNo entry on AESO’s connection list carries its name, and Alberta’s interim grid capacity has already been allocated.
- Power path
- Grid
- Setup
- Not stated
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- 2025-02-25
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection