Announced
1.0 GW
announced
0 MW
energized
None of it is built and energized yet.
Tourmaline's subsidiary proposes a power plant and data centre next to its Banshee gas plant that would turn gas into roughly one gigawatt of electricity. The company says about 930 MW would come from on-site gas and the rest from the grid, with a first phase running in 2028. It still needs land-use, water, power plant and Crown land approvals.
Where it standsIts power plan combines the grid with dedicated generation. No entry on AESO’s connection list carries its name, and Alberta’s interim grid capacity has already been allocated. The company targets 2028.
- 2026-08-12 Announced
- 2028 Developer target
- Power path
- Hybrid
- Setup
- On-site gas generation, about 930 MW, plus some grid power
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- 2028
- Announced
- 2026-08-12
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
- Beacon AI Data Centre Hub, Chestermere Beacon AI Centers · 400 MW · Announced
Updated 2026-10-14.