York Street Power

Power generation for AI infrastructure and energy

Send a requirement

Tell us what you need, and when you need it

We work directly with institutional clients: AI infrastructure developers, IPPs and energy companies. We also work with a handful of trusted partners, and every inquiry comes to us directly. Tell us what you need and we will tell you whether we can find it.

Specs, datasheets and photos by email to

The equipment

Status required
Voltage and configuration

Who is asking

Common questions

What should a turbine requirement include?

The model or class, capacity per unit, frequency and fuel, the site, the date it is needed on site and the condition you will accept. With those we can tell you what exists against your date.

Do you look at new and used units?

Yes, both, against your date. A new unit can mean a long wait for a large frame turbine; used and surplus units are already built.

Do you work with 50 Hz and 60 Hz turbines?

Yes, both. We scope 50 Hz and 60 Hz conversions with specialist engineers: generator, gearbox and controls.

External document

The publisher’s own file. It may download rather than open.

Open the document