York Street Power

Power generation for AI infrastructure and energy

Send a requirement

For our institutional clients

Transformers and switchgear on short lead times

Transformers, switchgear and E-houses from 15 kVA to 300 MVA+, for AI infrastructure developers, IPPs and energy companies. Lead times well inside the market average.

Get a quote Lead times against the market

Up to 345 kV
Padmount to substation class
Factory tested
Every unit, inspected by a third party
IEEE, IEC, CSA
Built to the standard your site needs
Oil-filled power transformer with high voltage bushings, conservator tank and cooling radiators

Transformers and switchgear we supply

For data centres, utilities, power generation, mining, oil and gas, and battery storage.

  • Oil-filled power transformer with high voltage bushings and radiators

    Power and substation transformers

    1 MVA to 300 MVA+, up to 345 kV

    Two-winding and autotransformers, including generator step-up units.

    Lead time
    6 to 12 months
  • Three-phase padmount transformer with its low voltage compartment open

    Padmount transformers

    75 kVA to 10 MVA

    Three-phase and oil-filled, for site power at data centres, plants, solar and battery yards.

    Lead time
    About 9 weeks ex-factory
    Quote this Photo: MalexCV, edited, CC BY 4.0
  • High voltage circuit breaker on a steel support frame

    Switchgear and breakers

    5 kV to 38 kV switchgear, 72.5 kV to 245 kV breakers

    Medium voltage lineups, ring main units and high voltage breakers for substations.

    Switchgear
    16 to 20 weeks ex-factory
    Breakers
    About 6 months

Get a transformer quote

What do you need?required

Transformer lead times against the market

Lead times in weeks: market average and through York Street Power
Equipment Market average Through us
Padmount and distribution 30 weeks About 9 weeks 21+ weeks sooner
Medium voltage switchgear 44 weeks 16 to 20 weeks 24+ weeks sooner
Power transformers 128 weeks 6 to 12 months 76+ weeks sooner

Market averages from Wood Mackenzie’s Q2 2025 lead time survey, reported by EE Power, August 2025 and POWER, January 2026. Generator step-up units averaged 144 weeks.

Supplied by a company we chose for speed and quality

We compared vendors across the market before choosing the supplier we use on most of our power projects. Our clients get its engineering, testing and lead times on every quote.

345 kV

Highest voltage class supplied

500+ units

Supplied to date by our supplier

Every unit

Factory tested and inspected by a third party

  1. Engineered to your specification

    Licensed professional engineers review the specification and stamp the shop drawings where the site needs it.

  2. Documented for approval

    Each unit ships with test reports, drawings and installation manuals for your utility and inspector.

  3. Delivered to site

    Import, customs and delivery are handled, with engineering support through commissioning.

  1. 1

    Send the requirement

    The type, the rating or project size, the site and when you need it.

  2. 2

    Engineers check it

    Voltages, standards and options are confirmed against your site.

  3. 3

    Price and lead time

    You get a quote with a confirmed lead time, by email.

  4. 4

    Built, tested, delivered

    Factory tested, inspected and delivered with full documentation.

Transformer specifications and standards

Padmount transformer

Rating
75 kVA to 10 MVA
Primary voltage
4.16 kV to 44 kV, multi-primary available
Secondary voltage
208Y/120 V to 600Y/347 V, including 480Y/277 and 400Y/230
Cooling and fluid
ONAN or KNAN; mineral oil, natural ester or FR3
Enclosure
Painted steel, or stainless on request
Options
Dual voltage, NGR, surge arresters, load break switch
Listing
UL, cUL and CSA certified, to CSA C227.4

Power and substation transformer

Rating
1 MVA to 300 MVA+
Voltage
Up to 345 kV
Types
Two-winding, autotransformer, generator step-up
Cooling
ONAN, ONAF or OFAF
Insulation
Mineral oil, natural ester or FR3
Testing
Full factory acceptance test to IEEE or IEC
Standards
IEEE C57, ANSI C57.12, IEC 60076, CSA

Dry-type transformer

Rating
15 kVA to 30 MVA
Voltage class
Up to 36 kV
Construction
Cast resin or VPI
Insulation class
F or H
Efficiency
NEMA TP-1 or CSA

Medium voltage switchgear

Voltage class
5 kV to 38 kV
Construction
Metal-clad or metal-enclosed, fixed or draw-out
Interruption
Vacuum or SF6
Also
Ring main units and load break switches
Standards
IEEE C37 and IEC 62271

High voltage breakers

Rated voltage
72.5 kV to 245 kV
Interruption
SF6 or vacuum
Configuration
Dead-tank or live-tank
Operating mechanism
Spring or hydraulic
Standard
IEC 62271-100

Instrument transformers

Current and voltage
36 kV to 765 kV
Combined CT and VT
36 kV to 245 kV
Insulation
Oil-immersed or SF6 gas
Standards
IEC 61869 and IEEE C57.13

Padmount units are UL, cUL and CSA certified. Power transformers are built to IEEE, ANSI, IEC and CSA standards, with seismic qualification to IEEE 693 where the site needs it. Certification for your country is confirmed on each quote.

E-house and solid state transformer specifications on request.

Transformer questions

What is the lead time for a padmount transformer?

Typically about 9 weeks ex-factory for 75 kVA to 10 MVA units, confirmed on the quote. Wood Mackenzie put the market average for distribution transformers at about 30 weeks in Q2 2025.

What is the lead time for a power transformer?

Typically 6 to 12 months for power and substation transformers from 1 MVA to 300 MVA+ and up to 345 kV, confirmed on the quote. The market average was 128 weeks in Wood Mackenzie's Q2 2025 survey.

Why are transformer lead times so long?

Demand from data centres, utilities and new generation has grown faster than factory capacity. Wood Mackenzie put average lead times in Q2 2025 at 128 weeks for power transformers, 144 weeks for generator step-up units and 44 weeks for switchgear.

Can you supply generator step-up (GSU) transformers?

Yes. Step-up units are quoted through the power transformer line, typically 6 to 12 months, confirmed on the quote. The market average was 144 weeks in Q2 2025.

Is 9 weeks the delivery date?

No. About 9 weeks is the typical time to leave the factory. Delivery to your site depends on where it is and is confirmed on the quote.

What is the lead time for medium voltage switchgear?

Typically 16 to 20 weeks ex-factory for 5 kV to 38 kV metal-clad and metal-enclosed lineups, confirmed on the quote. High voltage breakers from 72.5 kV to 245 kV are typically about 6 months.

What is the difference between a padmount and a dry-type transformer?

A padmount is oil-filled and sits outdoors on a concrete pad in a locked steel cabinet. A dry-type uses cast resin or VPI insulation with no oil, so it can sit indoors, for example in a data hall or an electrical room.

Do you supply transformers for data centres?

Yes: padmount transformers and medium voltage switchgear for the yard, dry-type transformers from 15 kVA to 30 MVA for indoor rooms, typically 8 to 16 weeks ex-factory, and prefabricated E-houses.

What standards are the transformers built to?

Power transformers are built to IEEE C57, ANSI C57.12, IEC 60076 and CSA standards, with IEEE 693 seismic qualification where needed. Padmount units are UL, cUL and CSA certified.

Do you supply projects internationally?

Yes. We quote for projects internationally, and units can be engineered to IEC as well as IEEE and ANSI standards. Delivery terms and certification for your country are confirmed on the quote.

What sizes of transformer do you cover?

From 15 kVA to 300 MVA+: padmount, dry-type and power and substation transformers, with medium voltage switchgear, high voltage breakers, instrument transformers and E-houses.

What do I need to send for a transformer quote?

The type, the rating in kVA or MVA, the site and when it is needed on site. Voltages, quantity, drawings or spec sheets help and can go to powergen@mccordinvestments.com.