Transformers and switchgear on short lead times
Transformers, switchgear and E-houses from 15 kVA to 300 MVA+, for AI infrastructure developers, IPPs and energy companies. Lead times well inside the market average.
Get a quote Lead times against the market
- Up to 345 kV
- Padmount to substation class
- Factory tested
- Every unit, inspected by a third party
- IEEE, IEC, CSA
- Built to the standard your site needs
Transformers and switchgear we supply
For data centres, utilities, power generation, mining, oil and gas, and battery storage.
-
Power and substation transformers
1 MVA to 300 MVA+, up to 345 kV
Two-winding and autotransformers, including generator step-up units.
- Lead time
- 6 to 12 months
-
Padmount transformers
75 kVA to 10 MVA
Three-phase and oil-filled, for site power at data centres, plants, solar and battery yards.
- Lead time
- About 9 weeks ex-factory
Quote this Photo: MalexCV, edited, CC BY 4.0 -
Switchgear and breakers
5 kV to 38 kV switchgear, 72.5 kV to 245 kV breakers
Medium voltage lineups, ring main units and high voltage breakers for substations.
- Switchgear
- 16 to 20 weeks ex-factory
- Breakers
- About 6 months
- Dry-type transformers 15 kVA to 30 MVA, up to 36 kV 8 to 16 weeks ex-factory
- Generator step-up transformers Quoted through the power transformer line 6 to 12 months
- E-houses Electrical buildings with the switchgear fitted and tested before they ship. On the quote
- Instrument transformers Current and voltage, 36 kV to 765 kV On request
- Solid state transformers Modular units for data centre power On request
Get a transformer quote
Transformer lead times against the market
| Equipment | Market average Through us |
|---|---|
| Padmount and distribution | |
| Medium voltage switchgear | |
| Power transformers |
Market averages from Wood Mackenzie’s Q2 2025 lead time survey, reported by EE Power, August 2025 and POWER, January 2026. Generator step-up units averaged 144 weeks.
Supplied by a company we chose for speed and quality
We compared vendors across the market before choosing the supplier we use on most of our power projects. Our clients get its engineering, testing and lead times on every quote.
345 kV
Highest voltage class supplied
500+ units
Supplied to date by our supplier
Every unit
Factory tested and inspected by a third party
-
Engineered to your specification
Licensed professional engineers review the specification and stamp the shop drawings where the site needs it.
-
Documented for approval
Each unit ships with test reports, drawings and installation manuals for your utility and inspector.
-
Delivered to site
Import, customs and delivery are handled, with engineering support through commissioning.
- 1
Send the requirement
The type, the rating or project size, the site and when you need it.
- 2
Engineers check it
Voltages, standards and options are confirmed against your site.
- 3
Price and lead time
You get a quote with a confirmed lead time, by email.
- 4
Built, tested, delivered
Factory tested, inspected and delivered with full documentation.
Transformer specifications and standards
Padmount transformer
- Rating
- 75 kVA to 10 MVA
- Primary voltage
- 4.16 kV to 44 kV, multi-primary available
- Secondary voltage
- 208Y/120 V to 600Y/347 V, including 480Y/277 and 400Y/230
- Cooling and fluid
- ONAN or KNAN; mineral oil, natural ester or FR3
- Enclosure
- Painted steel, or stainless on request
- Options
- Dual voltage, NGR, surge arresters, load break switch
- Listing
- UL, cUL and CSA certified, to CSA C227.4
Power and substation transformer
- Rating
- 1 MVA to 300 MVA+
- Voltage
- Up to 345 kV
- Types
- Two-winding, autotransformer, generator step-up
- Cooling
- ONAN, ONAF or OFAF
- Insulation
- Mineral oil, natural ester or FR3
- Testing
- Full factory acceptance test to IEEE or IEC
- Standards
- IEEE C57, ANSI C57.12, IEC 60076, CSA
Dry-type transformer
- Rating
- 15 kVA to 30 MVA
- Voltage class
- Up to 36 kV
- Construction
- Cast resin or VPI
- Insulation class
- F or H
- Efficiency
- NEMA TP-1 or CSA
Medium voltage switchgear
- Voltage class
- 5 kV to 38 kV
- Construction
- Metal-clad or metal-enclosed, fixed or draw-out
- Interruption
- Vacuum or SF6
- Also
- Ring main units and load break switches
- Standards
- IEEE C37 and IEC 62271
High voltage breakers
- Rated voltage
- 72.5 kV to 245 kV
- Interruption
- SF6 or vacuum
- Configuration
- Dead-tank or live-tank
- Operating mechanism
- Spring or hydraulic
- Standard
- IEC 62271-100
Instrument transformers
- Current and voltage
- 36 kV to 765 kV
- Combined CT and VT
- 36 kV to 245 kV
- Insulation
- Oil-immersed or SF6 gas
- Standards
- IEC 61869 and IEEE C57.13
Padmount units are UL, cUL and CSA certified. Power transformers are built to IEEE, ANSI, IEC and CSA standards, with seismic qualification to IEEE 693 where the site needs it. Certification for your country is confirmed on each quote.
E-house and solid state transformer specifications on request.
Transformer questions
What is the lead time for a padmount transformer?
Typically about 9 weeks ex-factory for 75 kVA to 10 MVA units, confirmed on the quote. Wood Mackenzie put the market average for distribution transformers at about 30 weeks in Q2 2025.
What is the lead time for a power transformer?
Typically 6 to 12 months for power and substation transformers from 1 MVA to 300 MVA+ and up to 345 kV, confirmed on the quote. The market average was 128 weeks in Wood Mackenzie's Q2 2025 survey.
Why are transformer lead times so long?
Demand from data centres, utilities and new generation has grown faster than factory capacity. Wood Mackenzie put average lead times in Q2 2025 at 128 weeks for power transformers, 144 weeks for generator step-up units and 44 weeks for switchgear.
Can you supply generator step-up (GSU) transformers?
Yes. Step-up units are quoted through the power transformer line, typically 6 to 12 months, confirmed on the quote. The market average was 144 weeks in Q2 2025.
Is 9 weeks the delivery date?
No. About 9 weeks is the typical time to leave the factory. Delivery to your site depends on where it is and is confirmed on the quote.
What is the lead time for medium voltage switchgear?
Typically 16 to 20 weeks ex-factory for 5 kV to 38 kV metal-clad and metal-enclosed lineups, confirmed on the quote. High voltage breakers from 72.5 kV to 245 kV are typically about 6 months.
What is the difference between a padmount and a dry-type transformer?
A padmount is oil-filled and sits outdoors on a concrete pad in a locked steel cabinet. A dry-type uses cast resin or VPI insulation with no oil, so it can sit indoors, for example in a data hall or an electrical room.
Do you supply transformers for data centres?
Yes: padmount transformers and medium voltage switchgear for the yard, dry-type transformers from 15 kVA to 30 MVA for indoor rooms, typically 8 to 16 weeks ex-factory, and prefabricated E-houses.
What standards are the transformers built to?
Power transformers are built to IEEE C57, ANSI C57.12, IEC 60076 and CSA standards, with IEEE 693 seismic qualification where needed. Padmount units are UL, cUL and CSA certified.
Do you supply projects internationally?
Yes. We quote for projects internationally, and units can be engineered to IEC as well as IEEE and ANSI standards. Delivery terms and certification for your country are confirmed on the quote.
What sizes of transformer do you cover?
From 15 kVA to 300 MVA+: padmount, dry-type and power and substation transformers, with medium voltage switchgear, high voltage breakers, instrument transformers and E-houses.
What do I need to send for a transformer quote?
The type, the rating in kVA or MVA, the site and when it is needed on site. Voltages, quantity, drawings or spec sheets help and can go to powergen@mccordinvestments.com.