AI infrastructure · Energy · Industrial
How we reach what the market will not list.
We find critical power and industrial equipment the open market does not list. One discontinued part or a whole power route.
We work only with our institutional clients and with the plants and title holders themselves.
Send the model or part number, configuration, condition, site and the date you need it.
This market is opaque by design. Most of it is never listed, and holders rarely advertise. What does surface usually comes through intermediaries who control nothing and can answer for less. We go straight to the holder.
Where the method came from
Built to see what a search cannot.
The work started on suspended and idle oil and gas facilities, where the only questions that mattered were what plant was still standing and what condition it was in. Satellite imagery answered part of that. The rest we built ourselves and keep sharpening: our own machine-assisted workflows for finding equipment that appears on no list and no register, pointed now at the power and industrial market.
The software narrows the field. People who have specified, inspected and moved this plant decide what is real. Neither half is useful without the other. Our own market intelligence, from connection queues, provincial capacity records and equipment lead times, tells us where to look.
The range
A whole power plant, or a single part.
A whole power route
The generation and electrical equipment for a development the grid will not reach in time, sequenced against the energization date. New build through OEM allocation relationships, existing units where the date needs them, and usually both at once.
AI infrastructure developers, IPPs and energy companies.
A single part
Discontinued, obsolete, allocated, or simply not listed anywhere. Outage-critical, and wanted in days.
Procurement, operations and outage teams in oil and gas, utilities and heavy industry.
Clear on who we act for
Who we act for on a transaction is agreed in writing before anything moves, and conflicts are managed before a route is opened.
Direct to the seller
Always the party that controls the equipment, whether that is an OEM holding an allocation or the owner of a unit that already exists. No chain of intermediaries in between.
One verified option
We bring the option that can hold your date, checked, with the next step spelled out.
The control system
Nothing moves until the unit, its owner and its records check out.
The method
Routes worked in parallel, against the date.
OEM and new buildWhere an allocation lands inside the date.
- Allocation
- Production
- Factory acceptance
- Delivery
Existing and secondaryWhere it does not, and the asset already exists.
- Locate
- Verify identity and authority
- Inspect records and condition
- Mobilize
Route selected against date, evidence, delivery exposure, and total delivered scope.
The market is not treated as a catalogue. Routes that cannot be evidenced, delivered, or transacted are removed before a buyer is asked to spend time on them.
- 01 Specify We write down exactly what you need: the model, configuration, duty, the condition you will accept, the site and the date it has to be there. You get A written specification
- 02 Find the routes We work new units through OEM allocation and existing units from the plants that hold them, at the same time. You get The routes we will work
- 03 Check the unit We confirm what the unit is, who holds title, and what its records show. We also look at the generator. If it needs work, we can arrange new stator coils and a rewind. You get What we confirmed about the unit
- 04 Set the terms Before any confidential information moves, we confirm who can sign on each side, put an NDA in place and agree the seller or OEM process. You get The terms to proceed
- 05 Bring you the best option We bring the option that best holds your date, with what we checked, the risks, and the next step. You get One option, ready to decide on
Verification standard
We check before we bring you anything.
Market information is separated from evidence. A route advances only as far as the underlying records, counterparty authority, and process allow.
- Identity
- Model, configuration, serial or part reference, and package scope.
- Control
- Seller authority, ownership path, and ability to transact.
- Condition
- Hours, inspection history, preservation, records, or physical review where available.
- Completeness
- Auxiliaries, controls, documentation, spares, interfaces, and exclusions.
- Delivery
- Release conditions, freight path, site constraints, and date exposure.
- Commercial process
- Confidentiality, buyer authority, seller procedure and conflict control.
Evidence state
- Stated
- Reported by a source. Not yet supported by the relevant records or process.
- Reviewed
- Material information has been reviewed against the requirement.
- Verified
- Identity, authority, and the key route facts have been confirmed to the extent the relevant process permits.
Decision basis
You get one clear option, weighed four ways.
The final comparison is built around the factors that determine whether an option can actually be bought and deployed.
| Required date | Technical and condition basis | Delivery and scope exposure | Commercial path |
|---|---|---|---|
| Whether the route can credibly land at site when the requirement needs it. | What the identity, configuration, records, condition evidence, and exclusions support. | What must still be confirmed across release, freight, interfaces, auxiliaries, and commissioning responsibility. | Who controls the route, what confidentiality applies, and what must happen next for the buyer to proceed. |
Price matters, and we weigh it alongside delivery and the path to owning and running the unit.
What we source
Equipment class is not the limit. The requirement has to be specific enough to test, verify, and execute.
-
Gas turbines, 20 to 300 MW+
Aeroderivative and frame units. Existing units are verified for title and authority to sell, and new capacity comes through OEM allocation.
Frequency, fuel, site conditions, package scope, and operating duty are confirmed before a supply path is assessed.
-
Transformers, switchgear and balance of plant
Short lead time transformers from 15 kVA to 300 MVA+, switchgear and E-houses for our clients, through the supplier we use on most power generation projects.
Lead times confirmed on each quote.
-
Turbine parts and components
Part-number-led searches for outage-critical spares and major components.
Matched on the OEM part number.
-
Heavy industrial assets
Plant and infrastructure equipment sourced through the same controlled process.
Technical review, when the route requires it
Engineers join when the job needs them.
Some requirements need independent technical work on configuration, site interface, fuel, grid, emissions or delivery scope. York Street Power coordinates the appropriate senior specialist alongside the sourcing process.
Tell us what you need, and when you need it.
Send the information you have. A part number helps; a rough equipment class can be enough to start. We will first establish whether a credible route exists.
- Model, part number, or equipment class
- Required configuration and acceptable condition
- Capacity, frequency, voltage, or operating duty where relevant
- Delivery site and required-on-site date
- Whether funds are approved or the requirement is still being costed
Keep your normal procurement. Call us when it cannot find the unit in time.