York Street Power

Power generation for AI infrastructure and energy

Send a requirement

Data centre projects and their power path

Canada. New build and large load. Updated monthly.

Brighter dots are further along

  1. Announced
  2. Filed for connection
  3. Construction
  4. Operating

Bigger dots have more megawatts announced.

Ringed: makes its own power on site

AI INFRASTRUCTURE · ENERGY · INDUSTRIAL · CANADA AND INTERNATIONAL

Hard to find. Needed fast.

Power generation for AI infrastructure and energy companies. Gas turbines and gensets, with transformers, switchgear and critical parts alongside, new or already built.

Speed is how we operate. We work directly with our institutional clients and hold the critical path on equipment.

When the unit is hard to find, or the lead time lands after the date, send the requirement.

Send a requirement How we work

What we source

Gas turbines first, and the equipment around them.

We look at new units from the manufacturer and at used or surplus units from plants worldwide. A new unit can mean waiting years for a factory slot. A used or surplus unit already exists.

A gas turbine on its transport stand, drawn in 3D
  1. AERODERIVATIVE TO FRAME

    Turbine parts and components

    Outage-critical parts sourced against the OEM part number and technical identity.

    Matched on the OEM part number.

  2. BEYOND GENERATION

    Heavy industrial assets

    Industrial sourcing across wider plant and infrastructure scope, on the same basis.

How we work

We work every requirement to a written specification.

  1. 01

    Define it

    Model or part number, capacity, frequency, voltage, configuration, accepted condition, quantity, site, and the date required on site.

  2. 02

    Look at new and used

    New from the manufacturer, and used or surplus from plants worldwide, both at once when the date is tight.

  3. 03

    Validate

    What the unit actually is, who controls it, what the records show, and whether the delivery path holds the date.

  4. 04

    Bring you the best option

    The one that best holds your date, with the evidence behind it and the next step to buy it.

Need more than the unit? A senior power systems engineer can scope configuration, grid connection, fuel and siting alongside it.

Our clients are AI infrastructure developers, IPPs and energy companies.

The date is the constraint.

When a project on Alberta's connection list slips, it slips 592 days at the median. Your build cannot. So the date comes first, and every option we bring is measured against it.

The evidence

Waiting for the grid costs years. Your own generation keeps the date.

Grid power in Alberta means joining AESO's connection list and waiting for a date. We read every monthly edition, entry by entry.

27.6 GW of data centre load is filed with AESO, across 62 entries on its own published list. 76% of that capacity carries no connection date.

  • 592 days, the median delay for the 14 requests on AESO's list that pushed back their date
  • 15 of 77 requests ever listed have since left the list

AESO's November 2026 list.

From AESO's published connection list. Most other operators publish nothing comparable, so elsewhere the map is built from filings, permits and company announcements. Map points are public projects, not York Street Power clients or equipment held.

Gas turbines and power equipment, straight from the title holder to our institutional clients.

Send a requirement.

Send a requirement

Or email

Send what you have. We will tell you whether we can find it, and how fast.

  • Model, part number, or equipment class, and capacity
  • Required configuration and condition, with frequency and voltage where they apply
  • Delivery location
  • Date required on site

Holding turbines or a plant? We place them directly with AI infrastructure developers and energy companies. Tell us what you are holding

External document

The publisher’s own file. It may download rather than open.

Open the document