Data centre projects and their power path
Canada. New build and large load. Updated monthly.
The map needs 3D graphics, which this browser does not support. Every project is listed in the province records.
Brighter dots are further along
- Announced
- Filed for connection
- Construction
- Operating
Bigger dots have more megawatts announced.
Ringed: makes its own power on site
AI INFRASTRUCTURE · ENERGY · INDUSTRIAL · CANADA AND INTERNATIONAL
Hard to find. Needed fast.
Power generation for AI infrastructure and energy companies. Gas turbines and gensets, with transformers, switchgear and critical parts alongside, new or already built.
Speed is how we operate. We work directly with our institutional clients and hold the critical path on equipment.
When the unit is hard to find, or the lead time lands after the date, send the requirement.
What we source
Gas turbines first, and the equipment around them.
We look at new units from the manufacturer and at used or surplus units from plants worldwide. A new unit can mean waiting years for a factory slot. A used or surplus unit already exists.
-
20 TO 300 MW+
Gas turbines
Aeroderivative and frame units. Existing units are verified for title and authority to sell, and new capacity comes through OEM allocation.
Frequency, fuel and site conditions are confirmed before a supply path is assessed.
-
15 KVA TO 300 MVA+
Transformers, switchgear, and balance of plant
Short lead time transformers, switchgear and E-houses, through the supplier we use on most power generation projects, for our institutional clients. Ask for a quote.
Lead times confirmed on each quote.
-
AERODERIVATIVE TO FRAME
Turbine parts and components
Outage-critical parts sourced against the OEM part number and technical identity.
Matched on the OEM part number.
-
BEYOND GENERATION
Heavy industrial assets
Industrial sourcing across wider plant and infrastructure scope, on the same basis.
How we work
We work every requirement to a written specification.
-
01
Define it
Model or part number, capacity, frequency, voltage, configuration, accepted condition, quantity, site, and the date required on site.
-
02
Look at new and used
New from the manufacturer, and used or surplus from plants worldwide, both at once when the date is tight.
-
03
Validate
What the unit actually is, who controls it, what the records show, and whether the delivery path holds the date.
-
04
Bring you the best option
The one that best holds your date, with the evidence behind it and the next step to buy it.
Need more than the unit? A senior power systems engineer can scope configuration, grid connection, fuel and siting alongside it.
Our clients are AI infrastructure developers, IPPs and energy companies.
The date is the constraint.
When a project on Alberta's connection list slips, it slips 592 days at the median. Your build cannot. So the date comes first, and every option we bring is measured against it.
The evidence
Waiting for the grid costs years. Your own generation keeps the date.
Grid power in Alberta means joining AESO's connection list and waiting for a date. We read every monthly edition, entry by entry.
27.6 GW of data centre load is filed with AESO, across 62 entries on its own published list. 76% of that capacity carries no connection date.
- 592 days, the median delay for the 14 requests on AESO's list that pushed back their date
- 15 of 77 requests ever listed have since left the list
AESO's November 2026 list.
From AESO's published connection list. Most other operators publish nothing comparable, so elsewhere the map is built from filings, permits and company announcements. Map points are public projects, not York Street Power clients or equipment held.
Gas turbines and power equipment, straight from the title holder to our institutional clients.
Send a requirement.
Or email powergen@mccordinvestments.com
Send what you have. We will tell you whether we can find it, and how fast.
- Model, part number, or equipment class, and capacity
- Required configuration and condition, with frequency and voltage where they apply
- Delivery location
- Date required on site
Holding turbines or a plant? We place them directly with AI infrastructure developers and energy companies. Tell us what you are holding