York Street Power

Power generation for AI infrastructure and energy

Send a requirement

IREN Prince George

IREN, 1144 Crocker Road, Prince George, BC

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

50 MW

announced

50 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

IREN's first site converted from bitcoin mining to AI cloud, with more than 23,000 GPUs installed or on order. IREN reports about US$0.4 billion of contracted yearly revenue at the site.

Where it standsRunning, with 50 MW energized.


Power path
Grid
Setup
AI cloud computing, converted from bitcoin mining
Utility
BC Hydro
Connection request
Not stated
Target online
2022
Announced
Not stated

Getting power in British Columbia

Competitive call. The British Columbia record covers how projects get power there and what is changing.

Sources

Other tracked projects in British Columbia


Updated 2026-10-14.

External document

The publisher’s own file. It may download rather than open.

Open the document