Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Operating
50 MW
announced
50 MW
energized
All of what was announced is built and energized. How much power it actually uses is not published.
IREN's first site converted from bitcoin mining to AI cloud, with more than 23,000 GPUs installed or on order. IREN reports about US$0.4 billion of contracted yearly revenue at the site.
Where it standsRunning, with 50 MW energized.
- Power path
- Grid
- Setup
- AI cloud computing, converted from bitcoin mining
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2022
- Announced
- Not stated
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 100 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
- Bell AI Fabric Merritt Bell Canada (Buzz HPC as tenant) · 7 MW · Operating
Updated 2026-10-14.