Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Announced
26 MW
announced
0 MW
energized
None of it is built and energized yet.
Bell's second 26 MW AI data centre in Kamloops, eyed for 2027. Castanet reported in June 2025 that it would also be on the Thompson Rivers University campus, more centrally than the first.
Where it standsIn BC Hydro’s area a new data centre over 10 MW gets power through a Call for Demand, unless it was already in BC Hydro’s study process; the first call’s results are still pending. The company targets 2027.
- 2025-05-28 Announced
- 2027 Developer target
- Power path
- Grid
- Setup
- Not stated
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- 2027
- Announced
- 2025-05-28
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 100 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
- Bell AI Fabric Merritt Bell Canada (Buzz HPC as tenant) · 7 MW · Operating