Bell AI Fabric, two more BC sites

Bell Canada, British Columbia, sites not named

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Announced

400 MW

announced

0 MW

energized

None of it is built and energized yet.

Two more Bell AI Fabric sites in British Columbia, which Bell says total more than 400 MW and are in advanced planning. Bell has not named the locations.

Where it standsIn BC Hydro’s area a new data centre over 10 MW gets power through a Call for Demand, unless it was already in BC Hydro’s study process; the first call’s results are still pending.

Not shown on the map. No location has been disclosed for this project beyond British Columbia, sites not named. Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.


Power path
Grid
Setup
Grid power
Utility
BC Hydro
Connection request
Not stated
Target online
Not stated
Announced
2025-05-28

Getting power in British Columbia

Competitive call. The British Columbia record covers how projects get power there and what is changing.