Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Operating
7 MW
announced
Not stated
energized
Bell and Buzz HPC launched the site in March 2026, with Buzz taking 6.5 MW. In June 2026 Bell agreed to provide capacity here for Cohere's models.
Where it standsRunning. The company has announced 7 MW; how much of it is energized is not stated.
- Power path
- Grid
- Setup
- Grid power, liquid-cooled GPUs
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- 2025-05-28
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
- Bell, Buzz HPC Announce new 6.5MW data centre in B.C.
- HIVE's BUZZ HPC Closes USD $220 Million Sovereign AI GPU Contract with Bell AI Fabric for Cohere Inc.
- Bell Canada nearly ready to flip the switch on its AI data centre in Merritt
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 100 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- IREN Canal Flats IREN · 30 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
Updated 2026-11-10.