York Street Power

Power generation for AI infrastructure and energy

Send a requirement

Bell AI Fabric Merritt

Bell Canada (Buzz HPC as tenant), Merritt, BC

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

7 MW

announced

Not stated

energized

Bell and Buzz HPC launched the site in March 2026, with Buzz taking 6.5 MW. In June 2026 Bell agreed to provide capacity here for Cohere's models.

Where it standsRunning. The company has announced 7 MW; how much of it is energized is not stated.


Power path
Grid
Setup
Grid power, liquid-cooled GPUs
Utility
BC Hydro
Connection request
Not stated
Target online
Not stated
Announced
2025-05-28

Getting power in British Columbia

Competitive call. The British Columbia record covers how projects get power there and what is changing.

Sources

Other tracked projects in British Columbia


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document