Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Operating
30 MW
announced
30 MW
energized
All of what was announced is built and energized. How much power it actually uses is not published.
IREN's first British Columbia site. IREN is taking out its bitcoin miners across its sites and plans liquid-cooled GPU deployments at Canal Flats in 2027.
Where it standsRunning, with 30 MW energized.
- Power path
- Grid
- Setup
- Bitcoin mining, converting to AI cloud computing
- Utility
- BC Hydro
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- Not stated
Getting power in British Columbia
Competitive call. The British Columbia record covers how projects get power there and what is changing.
Sources
Other tracked projects in British Columbia
- Bell AI Fabric, two more BC sites Bell Canada · 400 MW · Announced
- IREN Mackenzie IREN · 100 MW · Operating
- DMG Christina Lake DMG Blockchain Solutions · 75 MW · Operating
- IREN Prince George IREN · 50 MW · Operating
- Bell AI Fabric Kamloops, TRU campus Bell Canada with Thompson Rivers University · 26 MW · Construction
- Bell AI Fabric Kamloops, second site Bell Canada · 26 MW · Announced
- Bell AI Fabric Kamloops Bell Canada with Groq · 7 MW · Operating
- Bell AI Fabric Merritt Bell Canada (Buzz HPC as tenant) · 7 MW · Operating
Updated 2026-11-10.