IREN Mackenzie

IREN, Mackenzie, BC

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

100 MW

announced

80 MW

energized

80 MW of the 100 MW announced is built and energized. How much power it actually uses is not published.

Running at 80 MW since December 2022; IREN now describes Mackenzie as a 100 MW site. IREN is replacing bitcoin miners with GPUs here, backed by a US$2.4 billion financing in August 2026, and in November 2026 said construction of new liquid-cooled data centres had begun.

Where it standsRunning, with 80 MW energized of the 100 MW the company has announced.


Power path
Grid
Setup
Bitcoin mining, converting to AI cloud computing
Utility
BC Hydro
Connection request
Not stated
Target online
2022
Announced
Not stated

Getting power in British Columbia

Competitive call. The British Columbia record covers how projects get power there and what is changing.