Operating
67 MW
announced
67 MW
energized
All of what was announced is built and energized. How much power it actually uses is not published.
A 67 MW bitcoin mining site running since 2018, beside the City of Medicine Hat's gas plant. It mainly hosts American Bitcoin's miners.
Where it standsRunning, with 67 MW energized.
- Power path
- Grid
- Setup
- Grid power from the City of Medicine Hat
- Utility
- AESO
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- 2018-01-01
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
- Hut 8 Corp. Form 10-Q for the quarter ended June 30, 2026
- Hut 8 Mining Corp. Adds Additional Capacity to its City of Medicine Hat Facility
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved