York Street Power

Power generation for AI infrastructure and energy

Send a requirement

Hut 8 Medicine Hat Facility

Hut 8, Beside the City of Medicine Hat’s Unit 16 power plant, Medicine Hat, AB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

67 MW

announced

67 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

A 67 MW bitcoin mining site running since 2018, beside the City of Medicine Hat's gas plant. It mainly hosts American Bitcoin's miners.

Where it standsRunning, with 67 MW energized.


Power path
Grid
Setup
Grid power from the City of Medicine Hat
Utility
AESO
Connection request
Not stated
Target online
Not stated
Announced
2018-01-01

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.

Sources

Other tracked projects in Alberta


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document