Hut 8 Drumheller

Hut 8, Drumheller, AB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

42 MW

announced

42 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

A 42 MW bitcoin mining site that Hut 8 brought back online in March 2026 after two years idle. It hosts American Bitcoin's miners.

Where it standsRunning, with 42 MW energized.


Power path
Grid
Setup
Grid power
Utility
AESO
Connection request
Not stated
Target online
Not stated
Announced
Not stated

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.