Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Construction
10 MW
announced
0 MW
energized
Havenz says the first 10 MW of on-site gas generation is in construction and commissioning, beside a 10,800 sq ft modular data centre on a 120-acre site north of Red Deer. It plans 30 MW next, with gas supply contracted for it.
Where it standsUnder construction. It plans to make its own power on site, so its timing rests on building and permitting that plant rather than on a grid connection.
- Power path
- Behind the fence
- Setup
- On-site gas engines, hydrogen-ready
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- 2025-10-07
Getting power in Alberta
Bring your own generation. The Alberta record covers how projects get power there and what is changing.
Sources
- Red Deer County approves data centre
- Construction accelerates at AI data centre near Red Deer
- Havenz
Other tracked projects in Alberta
- Genesee Data Centre Capital Power · 1.5 GW · Filed for connection
- Wonder Valley AI Data Centre Park, Phase 1 O'Leary Ventures · 1.4 GW · Announced
- Wild Rose Data Centre BHE Canada · 1.3 GW · Filed for connection
- Beacon AI Hub, Indus Beacon AI Centers · 1.2 GW · Announced
- Meta Data Centre, Sturgeon County Meta · 1.0 GW · Construction
- Synapse Olds Data Centre Synapse Data Center Inc. · 1.0 GW · Not approved
- Malachite One Data Centre Emerald Energy Technologies (Tourmaline Oil) · 1.0 GW · Announced
- Beacon AI Hub, Heartland Beacon AI Centers · 800 MW · Filed for connection
Updated 2026-10-14.