Goldfinch Technology Park

Diode Ventures (Black & Veatch), Near Carseland, Wheatland County, AB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Announced

Not stated

announced

Not stated

energized

A 575-acre data centre campus. In August 2026 Wheatland County council rezoned the land for industrial use on a 4 to 3 vote. AESO lists it as Goldfinch Technology Park MPC Load, 950 MW in two stages, under review. Diode says it is working with AESO on how much power can be supplied and will pay for the grid upgrades.

Where it standsIt is on AESO’s connection list, but AESO has given it no in-service date.

  1. 2025-03-19 Filed with the operator 950 MW filed
  2. 2026-09-03 Announced
  3. No date In service the operator has set no date

Power path
Grid
Setup
Not stated
Utility
AESO
Connection request
AESO P3102 Goldfinch Technology Park MPC Load (950 MW)
Target online
Not stated
Announced
2026-09-03

Filed with the system operator

From AESO's connection list.

Reference Stage Filed In service Status
P3102
  • EN1 650 MW not scheduled
  • EN2 300 MW not scheduled
950 MW No date No date yet

One entry, 950 MW as filed.

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.

Sources

Other tracked projects in Alberta


Updated 2026-11-10.