Captus Generation AI Data Centre

Captus Generation (Summit Point Capital), South of Pincher Creek, AB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Filed for connection

Not stated

announced

Not stated

energized

Captus plans a gas plant on an 825-acre site south of Pincher Creek to power an on-site data centre, with the grid as backup. It says the data centre's size has not been decided, has not signed a data centre partner and has not applied to the municipality. AESO has a 74.9 MW load request on file.

Where it standsAESO’s date for its grid connection is September 2027. Its power plan combines the grid with dedicated generation.

  1. 2025-01-17 Filed with the operator 75 MW filed
  2. 2027-09-01 In service

Power path
Hybrid
Setup
Planned on-site gas plant, first phase about 400 MW, with grid backup
Utility
AESO
Connection request
AESO P3079 Captus Load (75 MW)
Target online
Not stated
Announced
Not stated

Filed with the system operator

From AESO's connection list.

Reference Stage Filed In service Status
P3079 EN1 75 MW 2027-09-01 Dated

One entry, 75 MW as filed.

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.

Sources

Other tracked projects in Alberta


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document