Bitdeer Fox Creek Facility

Bitdeer Technologies Group, Opal power plant site, about 1.3 km south of Fox Creek, AB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Construction

100 MW

announced

0 MW

energized

Originally Kiwetinohk Energy's Opal gas power project, bought by Bitdeer in February 2025, on a 19-acre site. Bitdeer broke ground in June 2026 on a 101 MW gas plant for about 100 MW of computing capacity, with an approved 99 MW connection to the Alberta grid. It now expects to energize in the fourth quarter of 2027, for bitcoin mining with room for AI.

Where it standsUnder construction. AESO’s date for its grid connection is August 2027.

  1. 2025-02-04 Announced
  2. 2025-08-28 Filed with the operator 0 MW filed
  3. 2027-08-06 In service
  4. 2027-Q4 Developer target

Power path
Behind the fence
Setup
On-site gas plant, 101 MW, licensed and permitted
Utility
AESO
Connection request
AESO P3141 Opal Data Load (0 MW)
Target online
2027-Q4
Announced
2025-02-04

Filed with the system operator

From AESO's connection list.

Reference Stage Filed In service Status
P3141 EN1 Not stated 2027-08-06 Dated

One entry, MW not stated.

Getting power in Alberta

Bring your own generation. The Alberta record covers how projects get power there and what is changing.

Sources

Other tracked projects in Alberta


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document