York Street Power

Power generation for AI infrastructure and energy

Send a requirement

QScale Q01 Campus

QScale, 2280 Rue Albert-Dion, Lévis, QC

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

142 MW

announcedpower capacity; 114 MW of IT load

Not stated

energized

A campus on a former paper mill site in Lévis, with waste heat going to greenhouse farming. QScale says it has 142 MW of secured power for the campus, and in June 2026 it started building a second building that adds 60 MW of IT capacity. Goldman Sachs Alternatives bought QScale in May 2026, and the founders still run it.

Where it standsRunning. The company has announced 142 MW; how much of it is energized is not stated.


Power path
Grid
Setup
Hydro grid, waste heat to greenhouses
Utility
Hydro-Québec
Connection request
Not stated
Target online
2022
Announced
Not stated

Getting power in Quebec

Ministerial authorization. The Quebec record covers how projects get power there and what is changing.

Sources

Other tracked projects in Quebec


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document