York Street Power

Power generation for AI infrastructure and energy

Send a requirement

Keel Baie-Comeau

Keel Infrastructure (formerly Bitfarms), Baie-Comeau, QC

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

30 MW

announcedcontracted power

22 MW

energized

22 MW of the 30 MW (contracted power) is built and energized. How much power it actually uses is not published.

A 22 MW bitcoin mine in a leased building on Baie-Comeau's municipal power network. In September 2026 the city raised the site's contracted power from 22 to 30 MW and allowed all of it to be used for data centres, including AI. Keel, formerly Bitfarms, says it expects bitcoin mining to wind down gradually as it builds data centres.

Where it standsRunning, with 22 MW energized of the 30 MW the company has announced.


Power path
Grid
Setup
Hydro grid, bitcoin mining
Utility
City of Baie-Comeau municipal network
Connection request
Not stated
Target online
Not stated
Announced
Not stated

Getting power in Quebec

Ministerial authorization. The Quebec record covers how projects get power there and what is changing.

Sources

Other tracked projects in Quebec


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.