HIVE Lachute

HIVE Digital, Lachute, QC

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

34.5 MW

announced

34.5 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

A bitcoin mine in a building HIVE leases until June 2028, supplied by Hydro-Québec through the landlord's account. HIVE's annual report gives 34.5 MW of capacity, 33.6 MW of it in use. Its waste heat warms a swimming-pool factory next door. HIVE bought the operation from Cryptologic in 2020. Hydro-Québec has asked the Régie de l'énergie to raise the rate for crypto mining to an average of about 19.5 cents per kWh; in October 2026 a Superior Court judge found the government had overstepped with the decrees behind the increase, and Hydro-Québec is pressing ahead with its application.

Where it standsRunning, with 34.5 MW energized.


Power path
Grid
Setup
Hydro grid, bitcoin mining, waste heat reused next door
Utility
Hydro-Québec
Connection request
Not stated
Target online
Not stated
Announced
Not stated

Getting power in Quebec

Ministerial authorization. The Quebec record covers how projects get power there and what is changing.

Sources

Other tracked projects in Quebec


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document