Operating
34.5 MW
announced
34.5 MW
energized
All of what was announced is built and energized. How much power it actually uses is not published.
A bitcoin mine in a building HIVE leases until June 2028, supplied by Hydro-Québec through the landlord's account. HIVE's annual report gives 34.5 MW of capacity, 33.6 MW of it in use. Its waste heat warms a swimming-pool factory next door. HIVE bought the operation from Cryptologic in 2020. Hydro-Québec has asked the Régie de l'énergie to raise the rate for crypto mining to an average of about 19.5 cents per kWh; in October 2026 a Superior Court judge found the government had overstepped with the decrees behind the increase, and Hydro-Québec is pressing ahead with its application.
Where it standsRunning, with 34.5 MW energized.
- Power path
- Grid
- Setup
- Hydro grid, bitcoin mining, waste heat reused next door
- Utility
- Hydro-Québec
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- Not stated
Getting power in Quebec
Ministerial authorization. The Quebec record covers how projects get power there and what is changing.
Sources
- HIVE Digital Technologies Ltd. Form 10-K, fiscal year ended March 31, 2026
- Operations: HIVE Digital Technologies
Other tracked projects in Quebec
- QScale Q01 Campus QScale · 142 MW · Operating
- Vantage Quebec City Campus Vantage Data Centers · 86 MW · Operating
- Gatineau Data Hub AVAIO Digital Partners / Société immobilière ADAM · 50 MW · Not approved
- Keel Sherbrooke, Bunker Keel Infrastructure (formerly Bitfarms) · 48 MW · Operating
- eStruxture MTL-2 eStruxture · 30 MW · Operating
- Vantage Montreal III Vantage Data Centers · 30 MW · Operating
- Keel Baie-Comeau Keel Infrastructure (formerly Bitfarms) · 30 MW · Operating
- Keel Sherbrooke, Léger Keel Infrastructure (formerly Bitfarms) · 30 MW · Operating
Updated 2026-11-10.