Yondr Toronto Data Centre

Yondr, 3125 Steeles Ave E, Toronto, ON

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

27 MW

announced

27 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

Yondr energized the 27 MW building in April 2026 and says it will be ready for service in mid-2026. It uses closed-loop cooling with no water used for evaporation.

Where it standsRunning, with 27 MW energized.

  1. 2025-01-29 Announced
  2. 2026 Developer target

Power path
Grid
Setup
Grid power, closed-loop cooling
Utility
Toronto Hydro
Connection request
Not stated
Target online
2026
Announced
2025-01-29

Getting power in Ontario

Grid, provincial approval in draft. The Ontario record covers how projects get power there and what is changing.