York Street Power

Power generation for AI infrastructure and energy

Send a requirement

55H Brampton Data Centre

55H with CORE Data Centres, Hereford Street, Brampton, ON

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

20 MW

announced

Not stated

energized

A Tier III high-density site of more than 126,000 sq ft, owned by Grain Management and run with Core Data Centres. 55H said in March 2025 that 2.5 MW was available for lease, with more phases taking it up to 20 MW.

Where it standsRunning. The company has announced 20 MW; how much of it is energized is not stated.

  1. 2025-03-05 Announced
  2. 2026-H1 Developer target

Power path
Grid
Setup
Grid power, liquid-cooled AI racks
Utility
Alectra Utilities
Connection request
Not stated
Target online
2026-H1
Announced
2025-03-05

Getting power in Ontario

Grid, provincial approval in draft. The Ontario record covers how projects get power there and what is changing.

Sources

Other tracked projects in Ontario


Updated 2026-11-10.

External document

The publisher’s own file. It may download rather than open.

Open the document