Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Announced
320 MW
announcedutility capacity
0 MW
energized
None of it is built and energized yet.
A C$3.5B, 320 MW AI campus on about 25 acres somewhere in the Greater Toronto Area. The exact site has not been published.
Where it standsOntario law lets the province set conditions on data centre connections, but no regulation applying them is in force yet; local grid capacity and municipal land use are what hold projects up. The company targets the second half of 2027.
- 2026-05-18 Announced
- 2027-H2 Developer target
Not shown on the map. No location has been disclosed for this project beyond Greater Toronto Area, ON. Its megawatts are counted in every total on this site; only the dot is withheld, because placing one would assert a site nobody has stated.
- Power path
- Grid
- Setup
- Grid power, closed-loop cooling
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- 2027-H2
- Announced
- 2026-05-18
Getting power in Ontario
Grid, provincial approval in draft. The Ontario record covers how projects get power there and what is changing.
Sources
- HIVE's BUZZ HPC Announces 320 MW Sovereign AI Infrastructure in Greater Toronto Area
- HIVE Achieves FY2026 Total Revenue of $297.8 Million, HIVE's BUZZ HPC Positioned for Growth
Other tracked projects in Ontario
- Algoma AI Data Centre Red Jar Energy Partners and Algoma Steel · 400 MW · Filed for connection
- STACK Toronto Campus STACK Infrastructure · 56 MW · Operating
- Cambridge AI Data Centre Related Digital, TowerBrook and Ascent · 54 MW · Operating
- Prologis Meadowvale Data Centre Prologis · 40 MW · Announced
- Compass Toronto Campus Compass Datacenters · 30 MW · Operating
- Yondr Toronto Data Centre Yondr · 27 MW · Operating
- 55H Brampton Data Centre 55H with CORE Data Centres · 20 MW · Operating
- Burlington Data Centre Owner not disclosed · 20 MW · Announced
Updated 2026-11-10.