Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Operating
7.5 MW
announced
7.5 MW
energized
All of what was announced is built and energized. How much power it actually uses is not published.
A 7.5 MW data centre built by MTS in 2015 and bought by Equinix in 2020 as part of a US$780 million deal for 13 Bell data centres.
Where it standsRunning, with 7.5 MW energized.
- Power path
- Grid
- Setup
- Not stated
- Utility
- Manitoba Hydro
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- Not stated
Getting power in Manitoba
Ministerial priority ranking. The Manitoba record covers how projects get power there and what is changing.
Sources
- Equinix Completes US$780 Million Acquisition of 13 Bell Data Centers in Canada
- Manitoba's AI data centre push, explained
Other tracked projects in Manitoba
- Bell AI Fabric Rosser Bell Canada · 5.5 MW · Construction
- Convergence Compute Campus Jet.AI and Consensus Core · MW not stated · Not approved