York Street Power

Power generation for AI infrastructure and energy

Send a requirement

Equinix WI1 Winnipeg

Equinix, 1450 Waverley Street, Winnipeg, MB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

7.5 MW

announced

7.5 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

A 7.5 MW data centre built by MTS in 2015 and bought by Equinix in 2020 as part of a US$780 million deal for 13 Bell data centres.

Where it standsRunning, with 7.5 MW energized.


Power path
Grid
Setup
Not stated
Utility
Manitoba Hydro
Connection request
Not stated
Target online
Not stated
Announced
Not stated

Getting power in Manitoba

Ministerial priority ranking. The Manitoba record covers how projects get power there and what is changing.

Sources

Other tracked projects in Manitoba


Updated 2026-10-14.

External document

The publisher’s own file. It may download rather than open.

Open the document