Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.
Not approved
Not stated
announced
Not stated
energized
Jet.AI and Consensus Core proposed a gas-powered AI data centre on about 350 acres south of Winnipeg, which they said could grow into the hundreds of megawatts. Premier Wab Kinew said on 4 June 2026 that it will not go ahead.
- Power path
- Behind the fence
- Setup
- On-site gas turbines
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- 2025-12-04
Getting power in Manitoba
Ministerial priority ranking. The Manitoba record covers how projects get power there and what is changing.
Sources
- Manitoba will reject hyperscale AI data centre south of Winnipeg, Kinew says
- Premier says no to massive AI data centre proposed for south of Winnipeg
Other tracked projects in Manitoba
- Equinix WI1 Winnipeg Equinix · 7.5 MW · Operating
- Bell AI Fabric Rosser Bell Canada · 5.5 MW · Construction
Updated 2026-10-14.