Operating
70 MW
announced
70 MW
energized
All of what was announced is built and energized. How much power it actually uses is not published.
A bitcoin mine HIVE owns in New Brunswick, bought with GPU Atlantic in April 2021. HIVE's annual report gives it a 70 MW substation and 70 MW of capacity, 37.2 MW of it in use. Power above the first 37.5 MW comes through interruptible or surplus energy arrangements at market prices.
Where it standsRunning, with 70 MW energized.
- Power path
- Grid
- Setup
- Grid, bitcoin mining
- Utility
- Not stated
- Connection request
- Not stated
- Target online
- Not stated
- Announced
- Not stated
Getting power in New Brunswick
Framework proposed. The New Brunswick record covers how projects get power there and what is changing.
Sources
- HIVE Digital Technologies Ltd. Form 10-K, fiscal year ended March 31, 2026
- Operations: HIVE Digital Technologies
Other tracked projects in New Brunswick
- Saint John AI Data Centre, Lorneville Beacon Data Centers and VoltaGrid · 390 MW · Announced
- Cross River Data Centre Campus, Saint John Cross River Infrastructure Partners · MW not stated · Announced
Updated 2026-11-10.