HIVE New Brunswick

HIVE Digital, Grand Falls, NB

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Operating

70 MW

announced

70 MW

energized

All of what was announced is built and energized. How much power it actually uses is not published.

A bitcoin mine HIVE owns in New Brunswick, bought with GPU Atlantic in April 2021. HIVE's annual report gives it a 70 MW substation and 70 MW of capacity, 37.2 MW of it in use. Power above the first 37.5 MW comes through interruptible or surplus energy arrangements at market prices.

Where it standsRunning, with 70 MW energized.


Power path
Grid
Setup
Grid, bitcoin mining
Utility
Not stated
Connection request
Not stated
Target online
Not stated
Announced
Not stated

Getting power in New Brunswick

Framework proposed. The New Brunswick record covers how projects get power there and what is changing.