EverWind Point Tupper AI Data Centre Campus

EverWind, Point Tupper, Richmond County, NS

Tracked from public sources. A listing here does not mean York Street Power works with this project or its developer.

Announced

95 MW

announced

0 MW

energized

None of it is built and energized yet.

An AI data centre campus at EverWind's Point Tupper site in Cape Breton. EverWind puts more than $8B into the campus, part of a $10B-plus investment that includes $2B for wind farms. It says the first 95 MW phase comes in late 2027 and a 325 MW expansion in 2028, for 420 MW at full build, on a long-term lease with Anthropic, which has confirmed the lease. EverWind says it will not connect to the grid until the required system studies and approvals are complete, and the province's environment department says the campus needs an industrial approval rather than an environmental assessment.

Where it standsNova Scotia has no data centre process, so it goes through Nova Scotia Power’s general one. The company targets 2027.

  1. 2026-10-16 Announced
  2. 2027 Developer target

Power path
Grid
Setup
Not stated
Utility
Not stated
Connection request
Not stated
Target online
2027
Announced
2026-10-16

Getting power in Nova Scotia

Utility large-load process. The Nova Scotia record covers how projects get power there and what is changing.

Sources


Updated 2026-11-10.